RCP also ran a separate four-year programme to strengthen the four earthquake-prone buildings, around $30 million of work, all of it inside a live shopping centre. RCP scheduled it with Stride and the main contractor to keep disruption off the tenants, working at night and shifting shops around as the strengthening moved from building to building.
The centre came back in stages, the car park first, open in time for the Christmas rush, then the cinema, then the strengthened buildings one by one, handed back to Stride and to a community that could trust it again.