Ngatamariki Geothermal Power Station was commissioned in 2013 by Mighty River Power and now forms an integral part of Mercury Energy’s renewable energy portfolio.

At a total cost of over $446 million, the station is operated as a Binary Plant producing over 82MW of electricity. The power station is strategically located at the centre of five separate extraction and reinjection wells, some drilled to a depth of over 3,500m, and each reticulated back to the station. The main feature of the station is a cooling system comprising of four separate structures which when combined, stretch over 300m and are nearly 15m high.