About

One New Zealand Stadium closes the chapter on Christchurch's earthquake recovery and opens a new one as a sporting and cultural capital.


One New Zealand Stadium

Te Kaha

Project Lead

Waren Warfield

Client

Christchurch City Council

Location

Christchurch

Status

Completed 2026

One NZ Stadium is the last of the anchor projects from Christchurch's earthquake recovery blueprint, a fully covered multi-use arena seating up to 37,000. Its central city location anchors the rebuilt CBD in a way no other major New Zealand stadium does. RCP was part of the consortium that authored the original recovery blueprint, and recommended moving the stadium from Lancaster Park into the central city.

Christchurch had been without a major stadium since Lancaster Park was decommissioned after the 2010 and 2011 earthquakes, with a temporary venue serving the city for over a decade. The Council needed a permanent home for major sport and live entertainment that would re-establish Christchurch as a sporting and cultural capital and finally close out the rebuild blueprint.

Holding the model together

The venue itself had to be at the leading edge of stadium engineering in New Zealand: a fully roofed, multi-use design built to host rugby, concerts and major events under a single covered bowl. Funding was jointly underwritten by Christchurch City Council and the Crown, and delivery ran through a three-stage collaborative procurement model that required deep alignment between client, designer and contractor before construction could begin.


When the project moved into delivery, the Council appointed RCP as project and design manager and contract administrator for the Pre-Contract Services Agreement, with that engagement extended through detailed design and construction. Working alongside main contractor BESIX Watpac and architects Populous and Warren and Mahoney, RCP led the collaborative environment that made the procurement model work, aligning client, designer and contractor on a buildable, budget-aligned scheme. From day one of the appointment, RCP raised the post-covid hyperinflation risk Council had not yet provisioned for, an early intervention that protected the budget through the most volatile period of the build.